Acme Solar Holdings: C ommissioning of Battery Energy Storage System (BESS) Project
Acme Solar Holdings (ACMESOLAR) filed a disclosure titled "C ommissioning of Battery Energy Storage System (BESS) Project". The company is valued at about ₹30,138 crore.
What happened
Acme Solar Holdings (ACMESOLAR) filed a disclosure with the exchanges on 27 November 2026 at 11:47 PM titled "C ommissioning of Battery Energy Storage System (BESS) Project".
Company snapshot
Acme Solar Holdings is a mid-cap company in the Power sector, with a market value of about ₹30,138 crore.
The stock last traded at ₹426.4, against a 52-week range of ₹195.9–₹476.9 (10.6% below the high).
Before this filing the shares had moved −0.1% over the month and +7.6% over three months. Average daily turnover over the last 20 sessions was about ₹32.8 crore.
Promoters held 71.40% at the end of Q2 FY27. Foreign institutions owned 6.44% and domestic institutions 17.46%.
| Quarter | Revenue | Net profit | EPS (₹) |
|---|---|---|---|
| Q2 FY26 | 468 | 115.1 | 1.9 |
| Q3 FY26 | 497 | 113.7 | 1.88 |
| Q4 FY26 | 548 | 139.3 | 2.3 |
| Q1 FY27 | 858 | 235.3 | 3.71 |
| Q2 FY27 | 887 | 268.4 | 4 |
What history shows
BCEIE's records show 12 or more previous similar filings from the company since May 2026.
After those filings, the stock gained 1.6% on average the next trading day and was down 0.3% on average after five days (11 filings with price data).
Across 18 similar disclosures by other Power companies, shares moved −0.7% on average the next day and −0.7% over five days; 28% of them rose the next day.
Market-wide, 207 similar filings with an impact score of 50 or more saw an average next-day move of +0.7%, with 48% rising.
Past reactions describe what happened before; they are not a forecast.
| Date | Filing | Next day | 5 days |
|---|---|---|---|
| 26 Nov 2026 | Commissioning of Battery Energy Storage Systems (BESS) Project | +2.3% | — |
| 25 Nov 2026 | An update on commissioning of Battery Energy Storage System (BESS)… | +2.3% | — |
| 22 Nov 2026 | ACME Solar Holdings Limited wins 50 MW of contracted capacity in… | +2.8% | — |
| 20 Nov 2026 | Update on commissioning of Battery Energy Storage System (BESS)… | +2.8% | — |
| 20 Nov 2026 | Commissioning of Battery Energy Storage Systems (BESS) Project | +2.8% | — |
In the news
Recent coverage elsewhere (links open the original publisher):
- ACMESOLAR Share Price Today - ACME Solar Holdings on NSE/BSE
- ACME Solar signs 150 MW hybrid power PPA with NTPC
- ACME Solar secures 25-year NTPC PPA for 150 MW hybrid
- ACME Solar Commissions 63.78 MW Battery Storage Capacity in Rajasthan Under NHPC Renewable Energy Project
- Acme Solar Holdings shares rise 2% after signing PPA with NTPC; shares soar 72% YTD
Source
Automatically written from the exchange filing and BCEIE data. Not investment advice. Check the original filing before acting on it.